Abstract
Due to cost economies and better serving the global market, many enterprises expanded their manufacturing environment from a localised, single-site facility to more globalised, multi-site facilities. In order to take advantage of operating multi-site facilities, it is vital to make optimisation decisions of resource utilisation as if these facilities situated across different geographical locations are one integrated facility and take into account of the extended multi-site constraints and variables. This paper proposes a multi-agent system, using its characteristics of autonomy and intelligence, to integrate process planning and production scheduling across different facilities, so as to secure the most efficient and cost-effective plan and schedule to meet the demand. A currency-based agent iterative bidding mechanism is developed to facilitate the co-ordination of agents to achieve the goal. A genetic algorithm is employed to tune the currency values for agent bidding. In this paper, a case study is used for simulation in order to demonstrate the effectiveness and performance of the proposed agent system. © 2013 Taylor & Francis.
| Original language | English |
|---|---|
| Pages (from-to) | 2620-2638 |
| Journal | International Journal of Production Research |
| Volume | 51 |
| Issue number | 9 |
| DOIs | |
| Publication status | Published - 1 May 2013 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Research Keywords
- genetic algorithm
- multi-agent system
- multi-site manufacturing
- optimisation
- production planning and control
Fingerprint
Dive into the research topics of 'Using a multi-agent system to optimise resource utilisation in multi-site manufacturing facilities'. Together they form a unique fingerprint.Cite this