N2 - Although the system reliability theory has a high capability in quality quantification, while system reliability optimization (SRO) has been well developed in manufacturing engineering, seldom can their applications be found in the construction industry. This study aims to develop a system reliability theory based multiple-objective optimization model to conduct SRO, and then identify the cost-quality trade-off solution for construction projects. First, the whole construction project is treated as a system composed of different work packages. Second, the reliability function is employed to quantify the quality performance and the nonlinear cost-reliability function is set up. Moreover, according to the physical arrangements among each work package, the system reliability structural function is determined. Third, the total construction cost minimization and system reliability maximization are defined as multiple-objectives. The particle swarm optimization algorithm is employed to search for the Pareto-optimal solutions, from which the final cost-quality trade-off solution can be selected. A real construction case is used to evaluate the workability of the proposed model and the results have fully proven its validity and practicality. © 2012 Elsevier B.V.
AB - Although the system reliability theory has a high capability in quality quantification, while system reliability optimization (SRO) has been well developed in manufacturing engineering, seldom can their applications be found in the construction industry. This study aims to develop a system reliability theory based multiple-objective optimization model to conduct SRO, and then identify the cost-quality trade-off solution for construction projects. First, the whole construction project is treated as a system composed of different work packages. Second, the reliability function is employed to quantify the quality performance and the nonlinear cost-reliability function is set up. Moreover, according to the physical arrangements among each work package, the system reliability structural function is determined. Third, the total construction cost minimization and system reliability maximization are defined as multiple-objectives. The particle swarm optimization algorithm is employed to search for the Pareto-optimal solutions, from which the final cost-quality trade-off solution can be selected. A real construction case is used to evaluate the workability of the proposed model and the results have fully proven its validity and practicality. © 2012 Elsevier B.V.
KW - Keywords
KW - Multiple objectives optimization model
KW - Particle swarm optimization algorithm
KW - System reliability optimization
KW - System reliability theory
UR - http://www.scopus.com/inward/record.url?scp=84871811056&partnerID=8YFLogxK
UR - https://www.scopus.com/record/pubmetrics.uri?eid=2-s2.0-84871811056&origin=recordpage
U2 - 10.1016/j.autcon.2012.11.040
DO - 10.1016/j.autcon.2012.11.040
M3 - RGC 21 - Publication in refereed journal
SN - 0926-5805
VL - 31
SP - 54
EP - 64
JO - Automation in Construction
JF - Automation in Construction
ER -