System reliability theory based multiple-objective optimization model for construction projects

Ran Tao, Chi-Ming Tam

    Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

    27 Citations (Scopus)

    Abstract

    Although the system reliability theory has a high capability in quality quantification, while system reliability optimization (SRO) has been well developed in manufacturing engineering, seldom can their applications be found in the construction industry. This study aims to develop a system reliability theory based multiple-objective optimization model to conduct SRO, and then identify the cost-quality trade-off solution for construction projects. First, the whole construction project is treated as a system composed of different work packages. Second, the reliability function is employed to quantify the quality performance and the nonlinear cost-reliability function is set up. Moreover, according to the physical arrangements among each work package, the system reliability structural function is determined. Third, the total construction cost minimization and system reliability maximization are defined as multiple-objectives. The particle swarm optimization algorithm is employed to search for the Pareto-optimal solutions, from which the final cost-quality trade-off solution can be selected. A real construction case is used to evaluate the workability of the proposed model and the results have fully proven its validity and practicality. © 2012 Elsevier B.V.
    Original languageEnglish
    Pages (from-to)54-64
    JournalAutomation in Construction
    Volume31
    Online published23 Dec 2012
    DOIs
    Publication statusPublished - May 2013

    Research Keywords

    • Keywords
    • Multiple objectives optimization model
    • Particle swarm optimization algorithm
    • System reliability optimization
    • System reliability theory

    Fingerprint

    Dive into the research topics of 'System reliability theory based multiple-objective optimization model for construction projects'. Together they form a unique fingerprint.

    Cite this