Scheduling to minimize product design time using a genetic algorithm

F. S. C. LAM, B. C. LIN, C. SRISKANDARAJAH*, H. YAN

*Corresponding author for this work

Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

Abstract

We consider a scheduling problem encountered in a semiconductor manufacturing company where the time for designing products (or makespan) needs to be minimized. The problem can be stated as follows: there are sets of tasks (or jobs) to be performed in a design project by a set of engineers. Since engineers are qualified to perform a certain set of jobs, so they are considered to be nonidentical. However, a job can be worked on by more than one engineer while an engineer can work on one job at a time. Moreover, there is a precedence relation among the jobs. The problem is to schedule jobs to engineers so that the make-span is minimized. We develop a Genetic Algorithm (GA) for this problem, which is one of combinatorial optimization subjects to many practical constraints. The GA is found to be very effective for solving this intractable problem. This research attempts to study this scheduling problem in a scientific manner and to propose ways in which the task can be automated with the help of an algorithm embedded in a computer program. © 1999 Taylor & Francis Ltd.
Original languageEnglish
Pages (from-to)1369-1386
JournalInternational Journal of Production Research
Volume37
Issue number6
DOIs
Publication statusPublished - 1999
Externally publishedYes

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure

Fingerprint

Dive into the research topics of 'Scheduling to minimize product design time using a genetic algorithm'. Together they form a unique fingerprint.

Cite this