Re-Engineering Construction Project Teams

  • M. Motiar Rahman*
  • , Mohan M. Kumaraswamy
  • , S. Thomas Ng
  • *Corresponding author for this work

Research output: Chapters, Conference Papers, Creative and Literary WorksRGC 32 - Refereed conference paper (with host publication)peer-review

Abstract

Effective management of unforeseen events at the post-contract stage needs the combined efforts of all major contracting parties in a collaborative teamworking manner, where the motivation of project participants plays a critical role. This in turn requires selection of appropriate 'partners' with an emphasis on their 'soft' qualities, to work under flexible contract conditions with suitable adjustment mechanisms and appropriate teambuilding protocols that would all be suited to a particular project. These conceptualized needs are discussed in the present paper, along with the summarized results from a series of recent Hong Kong based studies. Finally, a preliminary model for building a coalesced team comprising owners, consultants, contractors, subcontractors and suppliers is presented.
Original languageEnglish
Title of host publicationConstruction Research Cogress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress
PublisherAmerican Society of Civil Engineers
Pages751-759
ISBN (Print)0784406715, 9780784406717
DOIs
Publication statusPublished - 2003
Externally publishedYes
EventConstruction Research Congress: Winds of Change: Integration and Innovation in Construction - Honolulu, United States
Duration: 19 Mar 200321 Mar 2003
https://ascelibrary.org/doi/book/10.1061/9780784406717

Publication series

NameContruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress

Conference

ConferenceConstruction Research Congress
PlaceUnited States
CityHonolulu
Period19/03/0321/03/03
Internet address

Bibliographical note

Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].

Research Keywords

  • Integration
  • Procurement
  • Selection
  • Supply chain
  • Supply chain management
  • Teambuilding
  • Teamworking

Fingerprint

Dive into the research topics of 'Re-Engineering Construction Project Teams'. Together they form a unique fingerprint.

Cite this