Abstract
Effective management of unforeseen events at the post-contract stage needs the combined efforts of all major contracting parties in a collaborative teamworking manner, where the motivation of project participants plays a critical role. This in turn requires selection of appropriate 'partners' with an emphasis on their 'soft' qualities, to work under flexible contract conditions with suitable adjustment mechanisms and appropriate teambuilding protocols that would all be suited to a particular project. These conceptualized needs are discussed in the present paper, along with the summarized results from a series of recent Hong Kong based studies. Finally, a preliminary model for building a coalesced team comprising owners, consultants, contractors, subcontractors and suppliers is presented.
| Original language | English |
|---|---|
| Title of host publication | Construction Research Cogress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress |
| Publisher | American Society of Civil Engineers |
| Pages | 751-759 |
| ISBN (Print) | 0784406715, 9780784406717 |
| DOIs | |
| Publication status | Published - 2003 |
| Externally published | Yes |
| Event | Construction Research Congress: Winds of Change: Integration and Innovation in Construction - Honolulu, United States Duration: 19 Mar 2003 → 21 Mar 2003 https://ascelibrary.org/doi/book/10.1061/9780784406717 |
Publication series
| Name | Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress |
|---|
Conference
| Conference | Construction Research Congress |
|---|---|
| Place | United States |
| City | Honolulu |
| Period | 19/03/03 → 21/03/03 |
| Internet address |
Bibliographical note
Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].Research Keywords
- Integration
- Procurement
- Selection
- Supply chain
- Supply chain management
- Teambuilding
- Teamworking
Fingerprint
Dive into the research topics of 'Re-Engineering Construction Project Teams'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver