An availability model for the evaluation of equipment alternatives
Research output: Journal Publications and Reviews › RGC 21 - Publication in refereed journal › peer-review
Author(s)
Detail(s)
Original language | English |
---|---|
Pages (from-to) | 149-154 |
Journal / Publication | Journal of Operations Management |
Volume | 3 |
Issue number | 3 |
Publication status | Published - May 1983 |
Externally published | Yes |
Link(s)
Abstract
An availability based model for the evaluation of alternatives in equipment replacement analysis is presented. The expected annual cost of an equipment alternative is developed as a function of availability. The least cost alternative for the desired availability is identified from cost vs. availability curves of the alternatives. A simulation approach is used to determine the availability of existing equipment. The methodology is applied to the evaluation of alternate equipment for the analysis of serum samples in a hospital laboratory. © 1983.
Citation Format(s)
An availability model for the evaluation of equipment alternatives. / Lingaraj, B. P.; Kuo, Way.
In: Journal of Operations Management, Vol. 3, No. 3, 05.1983, p. 149-154.
In: Journal of Operations Management, Vol. 3, No. 3, 05.1983, p. 149-154.
Research output: Journal Publications and Reviews › RGC 21 - Publication in refereed journal › peer-review