PTT packet delay analysis for GPRS/GSM links
Research output: Journal Publications and Reviews (RGC: 21, 22, 62) › 21_Publication in refereed journal › peer-review
Author(s)
Detail(s)
Original language | English |
---|---|
Pages (from-to) | 456-458 |
Journal / Publication | IEEE Communications Letters |
Volume | 10 |
Issue number | 6 |
Publication status | Published - Jun 2006 |
Externally published | Yes |
Link(s)
Abstract
Push-to-Talk (PTT) is a new mobile service that enables fast-access and two-way communication between two or more users. This paper develops an approximate evaluation model for PTT delay performance in GPRS/GSM networks based on a quasi-stationary assumption and an M/G/1 processor sharing queueing model. Numerical results are presented in order to illustrate the effect of traffic load and other design parameters on PTT packet delay. © 2006 IEEE.
Research Area(s)
- GPRS, GSM, Packet retransmision, Performance evaluation, Push to talk (PTT)
Citation Format(s)
PTT packet delay analysis for GPRS/GSM links. / Wang, Yan; Zukerman, Moshe; Harris, Richard J.
In: IEEE Communications Letters, Vol. 10, No. 6, 06.2006, p. 456-458.Research output: Journal Publications and Reviews (RGC: 21, 22, 62) › 21_Publication in refereed journal › peer-review