Production scheduling of continuous flow lines : Multiple products with setup times and costs

Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

9 Scopus Citations
View graph of relations

Author(s)

Detail(s)

Original languageEnglish
Pages (from-to)387-400
Journal / PublicationProduction and Operations Management
Volume7
Issue number4
Publication statusPublished - Dec 1998
Externally publishedYes

Abstract

The problem of production planning and setup scheduling of multiple products on a single facility is studied in this paper. The facility can only produce one product at a time. A setup is required when the production switches from one type of product to another. Both setup times and setup costs are considered. The objective is to determine the setup schedule and production rate for each product that minimize the average total costs, which include the inventory, backlog, and setup costs. Under the assumption of a constant production rate, we obtain the optimal cyclic rotation schedule for the multiple products system. Besides the decision variables studied in the classical economic lot scheduling problem (ELSP), the production rate is also a decision variable in our model. We prove that our solutions improve the results of the classical ELSP.

Research Area(s)

  • Cyclic rotation schedule, Economic lot scheduling problem, Production planning, Setup scheduling