TY - JOUR
T1 - Predictive capacity planning
T2 - A proactive approach
AU - Sia, Choon-Ling
AU - Ho, Yin-Seong
PY - 1997
Y1 - 1997
N2 - There are a number of difficulties associated with traditional capacity planning studies which adopt a 'fix-it-later' approach. An underestimation of the costs of remedial action which produces only incremental improvements is an example of such difficulties. To address these difficulties, a proactive approach is proposed which uses a prediction-based performance model within a capacity planning framework to recommend either the configuration for a new computer system or the reconfiguration of an installed system. The model used in the framework predicts the resource usage of applications, comprising the potential workload of a system, given the structure of the application programs, the resource usage of their basic components, and forecasted workload characteristics. This information is used to identify applications which may compete for certain system resources if they are executed concurrently in the system. By characterizing the resource usage of the forecasted workload, the occurrence of capacity problems may be pre-empted. © 1997 Elsevier Science B.V. All rights reserved.
AB - There are a number of difficulties associated with traditional capacity planning studies which adopt a 'fix-it-later' approach. An underestimation of the costs of remedial action which produces only incremental improvements is an example of such difficulties. To address these difficulties, a proactive approach is proposed which uses a prediction-based performance model within a capacity planning framework to recommend either the configuration for a new computer system or the reconfiguration of an installed system. The model used in the framework predicts the resource usage of applications, comprising the potential workload of a system, given the structure of the application programs, the resource usage of their basic components, and forecasted workload characteristics. This information is used to identify applications which may compete for certain system resources if they are executed concurrently in the system. By characterizing the resource usage of the forecasted workload, the occurrence of capacity problems may be pre-empted. © 1997 Elsevier Science B.V. All rights reserved.
KW - Capacity planning
KW - Performance modelling
KW - Proactive approach
UR - http://www.scopus.com/inward/record.url?scp=0031095462&partnerID=8YFLogxK
UR - https://www.scopus.com/record/pubmetrics.uri?eid=2-s2.0-0031095462&origin=recordpage
U2 - 10.1016/S0950-5849(96)01142-1
DO - 10.1016/S0950-5849(96)01142-1
M3 - RGC 21 - Publication in refereed journal
SN - 0950-5849
VL - 39
SP - 195
EP - 204
JO - Information and Software Technology
JF - Information and Software Technology
IS - 3
ER -