Abstract
Scheduling a batch processing system has been extensively studied in the last decade. A batch processing system is modelled as a machine that can process up to b jobs simultaneously as a batch. The scheduling problem involves assigning all n jobs to batches and determining the batch sequence in such a way that certain objective function of job completion times Cj is minimized. In this paper, we address the scheduling problem under the on-line setting in the sense that we construct our schedule irrevocably as time proceeds and do not know of the existence of any job that may arrive later. Our objective is to minimize the total weighted completion time σ w jCj. We provide a linear time on-line algorithm for the unrestrictive model (i.e., b ≥ n) and show that the algorithm is 10/3-competitive. For the restrictive model (i.e., b < n), we first consider the (off-line) problem of finding a maximum independent vertex set in an interval graph with cost constraint (MISCP), which is NP-hard. We give a dual fully polynomial time approximation scheme for MISCP, which leads us to a (4 + 6)-competitive on-line algorithm for any 6 > 0 for the original on-line scheduling problem. These two on-line algorithms are the first deterministic algorithms of constant performance guarantees.
© 2004 Kluwer Academic Publishers
© 2004 Kluwer Academic Publishers
| Original language | English |
|---|---|
| Pages (from-to) | 85-95 |
| Journal | Journal of Combinatorial Optimization |
| Volume | 8 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - Mar 2004 |
Bibliographical note
Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].Funding
Research for the first two authors was supported in part by a research grant (Project #: CityU 1056/01E) of the Research Grants Council of Hong Kong Special Administrative Region, China, and a grant from UK/HK Joint Research Scheme (Project #9050128), for the first author by the ESRC Management Research Fellowship (UK), and for the third author by RGC grant 338/024/0009 and RCG grant 10202890.
Research Keywords
- Batch processing
- On-line
- Performance guarantee
- Scheduling
RGC Funding Information
- RGC-funded
Fingerprint
Dive into the research topics of 'On-line scheduling a batch processing system to minimize total weighted job completion time'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver