T1 - On-line scheduling a batch processing system to minimize total weighted job completion time
AU - Chen, Bo
AU - Deng, Xiaotie
AU - Zang, Wenan
N1 - Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].
PY - 2001
Y1 - 2001
N2 - Scheduling a batch processing system has been extensively studied in the last decade.A batch processing system is modelled as a machine that can process up to b jobs simultaneously as a batch.Th e scheduling problem involves assigning all n jobs to batches and determining the batch sequence in such a way that certain objective function of job completion times C j is minimized.In this paper, we address the scheduling problem under the on-line setting in the sense that we construct our schedule irrevocably as time proceeds and do not know of the existence of any job that may arrive later.Our objective is to minimize the total weighted completion time σw j C j . We provide a linear time on-line algorithm for the unrestrictive model (i.e., b ≥ n) and show that the algorithm is 10/3-competitive. For the restrictive model (i.e., b < n), we first consider the (off-line) problem of finding a maximum independent vertex set in an interval graph with cost constraint (MISCP), which is NP-hard. We give a dual fully polynomial time approximation scheme for MISCP, which leads us to a (4 + ε)-competitive on-line algorithm for any ε > 0 for the original on-line scheduling problem. These two on-line algorithms are the first deterministic algorithms of constant performance guarantees. © 2001 Springer Berlin Heidelberg.
AB - Scheduling a batch processing system has been extensively studied in the last decade.A batch processing system is modelled as a machine that can process up to b jobs simultaneously as a batch.Th e scheduling problem involves assigning all n jobs to batches and determining the batch sequence in such a way that certain objective function of job completion times C j is minimized.In this paper, we address the scheduling problem under the on-line setting in the sense that we construct our schedule irrevocably as time proceeds and do not know of the existence of any job that may arrive later.Our objective is to minimize the total weighted completion time σw j C j . We provide a linear time on-line algorithm for the unrestrictive model (i.e., b ≥ n) and show that the algorithm is 10/3-competitive. For the restrictive model (i.e., b < n), we first consider the (off-line) problem of finding a maximum independent vertex set in an interval graph with cost constraint (MISCP), which is NP-hard. We give a dual fully polynomial time approximation scheme for MISCP, which leads us to a (4 + ε)-competitive on-line algorithm for any ε > 0 for the original on-line scheduling problem. These two on-line algorithms are the first deterministic algorithms of constant performance guarantees. © 2001 Springer Berlin Heidelberg.
UR - https://www.scopus.com/pages/publications/27844461510
UR - https://www.scopus.com/pages/publications/27844461510#tab=impact
U2 - 10.1007/3-540-45678-3_33
DO - 10.1007/3-540-45678-3_33
M3 - RGC 32 - Refereed conference paper (with host publication)
SN - 3540429859
SN - 9783540429852
VL - 2223 LNCS
T3 - Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
SP - 380
EP - 389
BT - Algorithms and Computation - 12th International Symposium, ISAAC 2001, Proceedings
T2 - 12th International Symposium on Algorithms and Computation, ISAAC 2001
Y2 - 19 December 2001 through 21 December 2001
ER -