Abstract
This article develops a control chart system consisting of several individual time-between-events (TBE) charts, each of which is used to monitor the time between successive events at different process stages in the manufacturing of a product in a multistage manufacturing system. The design algorithm considers all the TBE charts within a system in an integrative and optimal manner. Numerical studies show that the proposed design algorithm improves the performance characteristics of the chart system significantly and thus the product quality is further guaranteed. The proposed control chart system is easy to understand and operate; thus, the floor operators can utilize and understand it as easily as for the traditional system. © 2007 Springer-Verlag London Limited.
| Original language | English |
|---|---|
| Pages (from-to) | 373-381 |
| Journal | International Journal of Advanced Manufacturing Technology |
| Volume | 40 |
| Issue number | 3-4 |
| DOIs | |
| Publication status | Published - Jan 2009 |
| Externally published | Yes |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Research Keywords
- Control chart system
- Exponential distribution
- Statistical process control
- Time-between-events
Fingerprint
Dive into the research topics of 'Integrated control chart system for time-between-events monitoring in a multistage manufacturing system'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver