Abstract
In this paper, we present an integrated model of both productivity and energy consumptions in serial production lines with two machines. Bernoulli reliability is assumed for both machines and the capacity of the buffer is finite. The energy consumption of each machine includes the energy required to set up the machine until it is ready for processing, and the additional energy needed to carry out the processing operation to make the product. The former is typically fixed for a specific manufacturing process, while the latter is proportional to the processing rate. The objective of the model is to minimise energy consumption, while maintaining the desired production rate. Specifically, analytical investigation has been carried out to discover the conditions that energy consumption can be minimised with and without the constraints of workforce or machine processing capability. Optimal allocations of them under different scenarios have been derived. Insights for reducing energy consumption while still ensuring desired productivity have been obtained. © 2016 Taylor & Francis.
| Original language | English |
|---|---|
| Pages (from-to) | 3414-3428 |
| Journal | International Journal of Production Research |
| Volume | 54 |
| Issue number | 11 |
| DOIs | |
| Publication status | Published - 2 Jun 2016 |
| Externally published | Yes |
Bibliographical note
Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].Funding
This work is supported in part by NSF [grant number CMMI-1063656]; National Science Foundation of China (NSFC) [grant number 71501109].
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
-
SDG 9 Industry, Innovation, and Infrastructure
Research Keywords
- Bernoulli reliability
- Energy consumption
- Production rate
- Two-machine line
- Workforce constraint
Fingerprint
Dive into the research topics of 'Improving energy efficiency in Bernoulli serial lines: An integrated model'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver