TY - GEN
T1 - IMPROVING A MULTISTAGE/MULTIPROCESSOR FLOW-SHIP PROBLEM OF NUMEROUS TECHNOLOGICAL CONSTRAINTS THROUGH SCHEDULING.
AU - Kuo, Way
AU - Yanney, Jon
AU - Tsai, Russell
PY - 1985/12
Y1 - 1985/12
N2 - The authors present the development process of the scheduling algorithm. First, the modeled Banbury production system and its associated operating and quality restrictions are described to familiarize the reader with the scheduling problem. A brief review of the literature is the discussed, leading to the objectives and assumptions governing the investigation. A GPSS simulation model is then detailed along with the results of the effectiveness of some very simple heuristic scheduling rules applied to the scheduling problem. Finally, the development of he actual heuristic algorithm created for this problem is described.
AB - The authors present the development process of the scheduling algorithm. First, the modeled Banbury production system and its associated operating and quality restrictions are described to familiarize the reader with the scheduling problem. A brief review of the literature is the discussed, leading to the objectives and assumptions governing the investigation. A GPSS simulation model is then detailed along with the results of the effectiveness of some very simple heuristic scheduling rules applied to the scheduling problem. Finally, the development of he actual heuristic algorithm created for this problem is described.
UR - https://www.scopus.com/pages/publications/0022327438
UR - https://www.scopus.com/record/pubmetrics.uri?eid=2-s2.0-0022327438&origin=recordpage
M3 - RGC 32 - Refereed conference paper (with host publication)
SN - 911801073
SP - 343
EP - 351
BT - Winter Simulation Conference Proceedings
PB - IEEE
ER -