Fuzzy simulation of flexible construction processes

Hong Zhang*, C. M. Tam

*Corresponding author for this work

    Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

    3 Citations (Scopus)

    Abstract

    This paper presents an incorporation of discrete-event simulation and fuzzy logic to model uncertainties in construction processes, i.e. flexible resource demand to activate an activity and flexible activity duration depending on the concrete resource quantities. The uncertain demand on resources is modelled with fuzzy set in linguistic term. The fuzzy logic if-then rule is built to control the activation of activities. The activity duration that varies with the involved quantities of resources is generated through the fuzzy logic reasoning. An activity scanning (AS) based diagram and a type of graphic fuzzy element assist in incorporating and implementing above fuzzy logic approach for the fuzzy construction simulation system. Through the application of the fuzzy construction simulation system, an illustrative example is presented to demonstrate the effect of considering these uncertainties on the productivity. © 2004 Inderscience Enterprises Ltd.
    Original languageEnglish
    Pages (from-to)15-25
    JournalInternational Journal of Computer Applications in Technology
    Volume20
    Issue number1-3
    Online published24 Feb 2004
    DOIs
    Publication statusPublished - 2004

    Research Keywords

    • Construction processes
    • Fuzzy sets and logic
    • Simulation and modelling
    • Uncertainties or flexibility

    Fingerprint

    Dive into the research topics of 'Fuzzy simulation of flexible construction processes'. Together they form a unique fingerprint.

    Cite this