Skip to main navigation Skip to search Skip to main content

Fuzzy discrete-event simulation for modeling uncertain activity duration

    Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

    Abstract

    Construction-oriented discrete-event simulation often faces the problem of defining uncertain information input, such as subjectivity in selecting probability distributions that result from insufficient or lack of site productivity data. This paper proposes incorporation of fuzzy set theory with discrete-event simulation to handle the vagueness, imprecision and subjectivity in the estimation of activity duration, especially when insufficient or no sample data are available. Based upon an improved activity scanning simulation algorithm, a fuzzy distance ranking measure is adopted in fuzzy simulation time advancement and event selection for simulation experimentation. The uses of the fuzzy activity duration and the probability distribution-modeled duration are compared through a series of simulation experiments. It is observed that the fuzzy simulation outputs are arrived at through only one cycle of fuzzy discrete-event simulation, still they contain all the statistical information that are produced through multiple cycles of simulation experiments when the probability distribution approach is adopted.
    Original languageEnglish
    Pages (from-to)426-437
    JournalEngineering, Construction and Architectural Management
    Volume11
    Issue number6
    DOIs
    Publication statusPublished - 2004

    Research Keywords

    • Construction industry
    • Fuzzy logic
    • Simulation

    Fingerprint

    Dive into the research topics of 'Fuzzy discrete-event simulation for modeling uncertain activity duration'. Together they form a unique fingerprint.

    Cite this