TY - GEN
T1 - Fully polynomial time approximation schemes for time-cost tradeoff problems in series-parallel project networks
AU - Halman, Nir
AU - Li, Chung-Lun
AU - Simchi-Levi, David
N1 - Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].
PY - 2008
Y1 - 2008
N2 - We consider the deadline problem and budget problem of the nonlinear time-cost tradeoff project scheduling model in a series-parallel activity network. We develop fully polynomial time approximation schemes for both problems using K-approximation sets and functions, together with series and parallel reductions. © 2008 Springer-Verlag Berlin Heidelberg.
AB - We consider the deadline problem and budget problem of the nonlinear time-cost tradeoff project scheduling model in a series-parallel activity network. We develop fully polynomial time approximation schemes for both problems using K-approximation sets and functions, together with series and parallel reductions. © 2008 Springer-Verlag Berlin Heidelberg.
KW - Approximation algorithms
KW - Project management
KW - Time-cost tradeoff
UR - https://www.scopus.com/pages/publications/51849106514
UR - https://www.scopus.com/record/pubmetrics.uri?eid=2-s2.0-51849106514&origin=recordpage
U2 - 10.1007/978-3-540-85363-3_8
DO - 10.1007/978-3-540-85363-3_8
M3 - RGC 32 - Refereed conference paper (with host publication)
SN - 3540853626
SN - 9783540853626
VL - 5171 LNCS
T3 - Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
SP - 91
EP - 103
BT - Approximation, Randomization and Combinatorial Optimization: Algorithms and Techniques - 11th International Workshop, APPROX 2008 and 12th International Workshop, RANDOM 2008, Proceedings
T2 - 11th International Workshop on Approximation Algorithms for Combinatorial Optimization Problems, APPROX 2008 and 12th International Workshop on Randomization and Computation, RANDOM 2008
Y2 - 25 August 2008 through 27 August 2008
ER -