Skip to main navigation Skip to search Skip to main content

Enhancing the logistics of construction materials through activity-based simulation approach

Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

Abstract

Purpose - Many planners and managers prefer to maintain more than enough construction materials on site to avoid valuable labour and plant resources staying idle. Despite the fact that minimising the buffer stock would improve the productivity of a construction project, no one likes to take this risk especially when the consequences are not totally clear. This paper aims to identify the possible savings in time and cost due to different amounts of buffer stock on site, by introducing an activity-based simulation model. Design/methodology/approach - In this research, details and data of a residential project involving substantial amounts of pre-cast components are collected. The project participants are asked to unveil the constraints on site and throughout the material delivery and storage processes. Finally, the collected data are fed into the activity-based construction simulation tool for analysis. Findings - The results indicate that simulation could help quantify the productivity of resources so as to establish the most suitable strategy for improving the logistics of materials handling in a construction project. Originality/value - The paper helps construction planners and managers to streamline the flow of construction materials and determine optimal buffer stocks rather than relying on subjective judgement. Copyright © 2009 Emerald Group Publishing Limited. All rights reserved.
Original languageEnglish
Pages (from-to)224-237
JournalEngineering, Construction and Architectural Management
Volume16
Issue number3
DOIs
Publication statusPublished - 1 May 2009
Externally publishedYes

Bibliographical note

Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].

Research Keywords

  • Buffer stock
  • Construction materials
  • Distribution management
  • Hong Kong
  • Just in time
  • Simulation

Fingerprint

Dive into the research topics of 'Enhancing the logistics of construction materials through activity-based simulation approach'. Together they form a unique fingerprint.

Cite this