Economic, energy and environmental life cycle assessment of a liquid flow window in different climates

Yuanli Lyu*, Tin-tai Chow

*Corresponding author for this work

Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

16 Citations (Scopus)

Abstract

In this study, life cycle assessment was applied to a novel liquid flow window, based on the cases of sports center application in different climates of Hong Kong and Beijing. The economic, environmental and energy impacts of selected window frame material, the expected lifetime and cost of the working fluid and accessory components were assessed. It was found that the use of wooden frame could be advantageous in that the cost payback time is less than 1.4 years in Hong Kong and well below 5.5 years in Beijing. Nevertheless, when stainless steel frame was in use, the cost payback period would increase to 3.0 and 7.0 years for Hong Kong and Beijing respectively. The lengthy payback time of Beijing is mainly caused by the use of expensive anti-freezer in the liquid circulation. Sensitivity test showed that by taking efforts to lower the material costs and to prolong the lifetime of working liquid, the cost payback time in Hong Kong and Beijing could be reduced to 1.5 and 3.6 years or lower.
Original languageEnglish
Pages (from-to)837–848
JournalBuilding Simulation
Volume13
Issue number4
Online published1 Jun 2020
DOIs
Publication statusPublished - Aug 2020

Research Keywords

  • building energy performance
  • economic
  • energy and environmental impacts
  • life cycle assessment
  • liquid flow window
  • payback periods

Fingerprint

Dive into the research topics of 'Economic, energy and environmental life cycle assessment of a liquid flow window in different climates'. Together they form a unique fingerprint.

Cite this