T1 - Dynamic Assessment of the Transfer Risks in China's Public-Private Partnership Water Projects
T2 - A System Dynamics Approach
AU - Guo, Yubo
AU - Wang, Xiaoli
AU - Liu, Linlin
AU - Chen, Chuan
AU - Martek, Igor
AU - Luo, Xiaowei
PY - 2023/12
Y1 - 2023/12
N2 - Public-private partnerships (PPPs) are the primary means of delivering water projects in developing countries. In China, most water PPP projects remain in the construction and operation stages, with few having passed to the transfer stage. The lack of experience in managing transfer risks is itself an impediment to the further development of China's PPPs. Thus, this study attempts to address two research concerns: (1) identifying transfer risks and risk factors, and (2) dynamically evaluating those transfer risks. Literature review, expert interviews, and process modeling via Integrated Computer-Aided Manufacturing Definition Method 0 (IDEF0) were utilized to identify and assess transfer risks with risk factors. The time-varying nature of transfer risks was evaluated using a system dynamics method. Eleven transfer risks and their value accumulation curves were identified. Value growth of legal and residual value risks remains steady over time. The risk values of contract, political, overhaul, information, and employee risks pose severe initial threats, but reduce on project transfer. However, credit, data transfer, after-transfer operational, and succession operator risks tend to escalate over time. The proposed model allows for a dynamic evaluation of transfer risks, and in so doing, improves the efficiency of PPP project transfer risk management. © 2023 American Society of Civil Engineers.
AB - Public-private partnerships (PPPs) are the primary means of delivering water projects in developing countries. In China, most water PPP projects remain in the construction and operation stages, with few having passed to the transfer stage. The lack of experience in managing transfer risks is itself an impediment to the further development of China's PPPs. Thus, this study attempts to address two research concerns: (1) identifying transfer risks and risk factors, and (2) dynamically evaluating those transfer risks. Literature review, expert interviews, and process modeling via Integrated Computer-Aided Manufacturing Definition Method 0 (IDEF0) were utilized to identify and assess transfer risks with risk factors. The time-varying nature of transfer risks was evaluated using a system dynamics method. Eleven transfer risks and their value accumulation curves were identified. Value growth of legal and residual value risks remains steady over time. The risk values of contract, political, overhaul, information, and employee risks pose severe initial threats, but reduce on project transfer. However, credit, data transfer, after-transfer operational, and succession operator risks tend to escalate over time. The proposed model allows for a dynamic evaluation of transfer risks, and in so doing, improves the efficiency of PPP project transfer risk management. © 2023 American Society of Civil Engineers.
KW - Public-private partnerships (PPPs)
KW - Risk assessment
KW - System dynamics method
KW - Transfer risk
KW - Water projects
UR - http://www.scopus.com/inward/record.url?scp=85174694769&partnerID=8YFLogxK
UR - https://www.scopus.com/record/pubmetrics.uri?eid=2-s2.0-85174694769&origin=recordpage
U2 - 10.1061/JITSE4.ISENG-2302
DO - 10.1061/JITSE4.ISENG-2302
M3 - RGC 21 - Publication in refereed journal
SN - 1076-0342
VL - 29
JO - Journal of Infrastructure Systems
JF - Journal of Infrastructure Systems
IS - 4
M1 - 04023033
ER -