Delay Analysis for a TDMA Channel with Contiguous Output and Poisson Message Arrival
Research output: Journal Publications and Reviews (RGC: 21, 22, 62) › 21_Publication in refereed journal › peer-review
Author(s)
Detail(s)
Original language | English |
---|---|
Pages (from-to) | 707-709 |
Journal / Publication | IEEE Transactions on Communications |
Volume | 32 |
Issue number | 6 |
Publication status | Published - Jun 1984 |
Externally published | Yes |
Link(s)
Abstract
An analysis of the exact delay of a TDMA or a loop communication system with a contiguous output and a Poisson message arrival process is presented. The nonlinear relationship of a contiguous output with arbitrary arrival process can be expressed by an infinite series. In the case of a Poisson message arrival process, the series can be summed to a closed form. The derived result, which is validated by simulation, is a vast improvement over the previously used approximate model of multiple frames with single output. © 1984 IEEE
Citation Format(s)
Delay Analysis for a TDMA Channel with Contiguous Output and Poisson Message Arrival. / Ko, King-Tim; Davis, Bruce R.
In: IEEE Transactions on Communications, Vol. 32, No. 6, 06.1984, p. 707-709.Research output: Journal Publications and Reviews (RGC: 21, 22, 62) › 21_Publication in refereed journal › peer-review