Delay analysis for a finite buffer TDMA model
Research output: Journal Publications and Reviews (RGC: 21, 22, 62) › 22_Publication in policy or professional journal
Author(s)
Related Research Unit(s)
Detail(s)
Original language | English |
---|---|
Pages (from-to) | 1791-1795 |
Journal / Publication | IEEE International Conference on Communications |
Volume | 3 |
Publication status | Published - 2003 |
Conference
Title | 2003 International Conference on Communications (ICC 2003) |
---|---|
Place | United States |
City | Anchorage, AK |
Period | 11 - 15 May 2003 |
Link(s)
Abstract
This paper provides an efficient solution for the derivation of the delay distribution for a TDMA system with a finite buffer. Assuming successive intervals of length equal to the duration of a slot, the density is expressed as (finite) linear combinations of gamma densities and beta densities with positive coefficients. The results are verified by simulations. Comparison with a previously proposed solution demonstrates that the solution presented here is more efficient.
Citation Format(s)
Delay analysis for a finite buffer TDMA model. / Neuts, Marcel F.; Guo, Jun; Zukerman, Moshe; Vu, Hai Le.
In: IEEE International Conference on Communications, Vol. 3, 2003, p. 1791-1795.Research output: Journal Publications and Reviews (RGC: 21, 22, 62) › 22_Publication in policy or professional journal