Abstract
The problem of customer demand satisfaction in production systems with unreliable machines and finite Finished Goods Buffers (FGB) is addressed. The measure of customer demand satisfaction, referred to as the Due-Time Performance (DTP), is characterized by the probability to ship to the customer a required number of parts during a fixed time interval. A method for DTP calculation is developed and applied within a case study.
| Original language | English |
|---|---|
| Pages (from-to) | 400-405 |
| Journal | Proceedings of the IEEE Conference on Decision and Control |
| Volume | 1 |
| DOIs | |
| Publication status | Published - 2000 |
| Externally published | Yes |
| Event | 39th IEEE Confernce on Decision and Control - Sydney, NSW, Australia Duration: 12 Dec 2000 → 15 Dec 2000 |
Bibliographical note
Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].Funding
This work was supported by NSF Grant No. DMI 9820580.
Fingerprint
Dive into the research topics of 'Customer demand satisfaction in production systems: A due-time performance approach'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver