Skip to main navigation Skip to search Skip to main content

Customer demand satisfaction in production systems: A due-time performance approach

Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

Abstract

The problem of customer demand satisfaction in production systems with unreliable machines and finite Finished Goods Buffers (FGB) is addressed. The measure of customer demand satisfaction, referred to as the Due-Time Performance (DTP), is characterized by the probability to ship to the customer a required number of parts during a fixed time interval. A method for DTP calculation is developed and applied within a case study.
Original languageEnglish
Pages (from-to)400-405
JournalProceedings of the IEEE Conference on Decision and Control
Volume1
DOIs
Publication statusPublished - 2000
Externally publishedYes
Event39th IEEE Confernce on Decision and Control - Sydney, NSW, Australia
Duration: 12 Dec 200015 Dec 2000

Bibliographical note

Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].

Funding

This work was supported by NSF Grant No. DMI 9820580.

Fingerprint

Dive into the research topics of 'Customer demand satisfaction in production systems: A due-time performance approach'. Together they form a unique fingerprint.

Cite this