Construction delay computation method

Jonathan Jingsheng Shi, S. O. Cheung, Avid Arditi

    Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

    73 Citations (Scopus)

    Abstract

    Delay is one of the most common problems in the construction industry. This paper presents a method for computing activity delays and assessing their contributions to project delay. The method consists of a set of equations, which can be easily coded into a computer program that allows speedy access to project delay information and activity contributions. The proposed method contrasts the as-planned and as-built schedules. It is not based on critical path analyses; therefore, it does not require the calculation or updating of the critical path, and it is even not necessary to update the as-planned schedule, as required by the traditional delay analysis methods. The results calculated from the proposed method include various variations of activity schedules and their contributions (in days) to the overall project delay. They provide an objective baseline for determining responsibilities of delays. The method can be integrated into any delay analysis system to further improve and automate the construction delay analysis process. Practical examples are used to illustrate the computation mechanism.
    Original languageEnglish
    Pages (from-to)60-65
    JournalJournal of Construction Engineering and Management
    Volume127
    Issue number1
    DOIs
    Publication statusPublished - Jan 2001

    Fingerprint

    Dive into the research topics of 'Construction delay computation method'. Together they form a unique fingerprint.

    Cite this