Abstract
In this work, serial production lines with finished goods buffers operating in the pull regime are considered. The machines are assumed to obey Bernoulli reliability model. The problem of satisfying customers demand is addressed. The level of demand satisfaction is quantified by the due-time performance (DTP), which is defined as the probability to ship to the customer a required number of parts during a fixed time interval. Within this scenario, the definitions of DTP bottlenecks are introduced and a method for their iden-tification is developed.
| Original language | English |
|---|---|
| Pages (from-to) | 479-498 |
| Journal | Mathematical Problems in Engineering |
| Volume | 5 |
| Issue number | 6 |
| DOIs | |
| Publication status | Published - 2000 |
| Externally published | Yes |
Bibliographical note
Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].Funding
This work was supported by NSF Grant No DMI-9820580
Research Keywords
- Blockage
- Bottleneck
- Due-time performance
- Production systems
- Starvation
Publisher's Copyright Statement
- This full text is made available under CC-BY 4.0. https://creativecommons.org/licenses/by/4.0/
Fingerprint
Dive into the research topics of 'Bottlenecks with Respect to Due-Time Performance in Pull Serial Production Lines'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver