Abstract
The application of BOT (Build - Operate - Transfer) system has a long history in the area of Hong Kong public service. This paper analyzes the practical implementation of BOT in Hong Kong tunnel projects and pinpoints problems associated with these projects. The experiences of Hong Kong can provide some reference for the development of transportation industry in Mainland China.
Translated title of the contribution | The Application of BOT in Hong Kong Tunnel Projects: 经验与教训 |
---|---|
Original language | Chinese (Traditional) |
Pages (from-to) | 26 - 30 |
Journal | 國際經貿探索 |
Volume | 9 |
Publication status | Published - 2007 |