Skip to main navigation Skip to search Skip to main content

Backwards square completion MPC solution for real-time economic dispatch in power networks

  • Hai-Tao Zhang
  • , Weigao Sun
  • , Zhiyong Chen*
  • , Haofei Meng
  • , Guanrong Chen
  • *Corresponding author for this work

Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

Abstract

The existing economic dispatch (ED) control structures in power systems are based on solving a quadratic optimisation problem, which can only guarantee the optimal steady-state performance. In this study, the authors formulate the real-time ED problem for the transient operation of power systems as a dynamic model predictive control (MPC) optimisation problem. A novel MPC solving method, named backwards square completion (BSC) is thereby proposed to solve it with guaranteed transient economic performance. Meanwhile, it satisfies the input and state security constraints. Conventional linear MPC algorithms routinely involve with inverse matrix calculation, which is computationally expensive and may result in singularity. By contrast, BSC algorithm replaces the inverse matrix calculation by recursive receding horizon optimisation problem solving, which significantly reduces the computational complexity in terms of the control horizon. The proposed BSC-MPC solution for real-time ED is applied to an IEEE 39-bus benchmark power network system to show its effectiveness and efficiency.
Original languageEnglish
Pages (from-to)2940-2947
JournalIET Control Theory and Applications
Volume13
Issue number17
Online published3 May 2019
DOIs
Publication statusPublished - 26 Nov 2019

Fingerprint

Dive into the research topics of 'Backwards square completion MPC solution for real-time economic dispatch in power networks'. Together they form a unique fingerprint.

Cite this