Skip to main navigation Skip to search Skip to main content

Assessment of the Long-lead Probabilistic Prediction for the Asian Summer Monsoon Precipitation (1983-2011) Based on the APCC Mutli-model System and a Statistical Model

S.-J. Sohn, Y.-M. Min, J.-Y. Lee, Chi Yung TAM, I.-S. Kang, B. Wang, J.-B. Ahn, T. Yamagata

Research output: Conference PapersRGC 33 - Other conference paper

Original languageEnglish
Publication statusPresented - 13 Aug 2012
EventAOGS - AGU (WPGM) Joint Assembly - , Singapore
Duration: 13 Aug 201217 Aug 2012

Conference

ConferenceAOGS - AGU (WPGM) Joint Assembly
PlaceSingapore
Period13/08/1217/08/12

Cite this