Abstract
Take into account the unique geographical location of Australia, there is a time difference of two hours between east and west coasts of the country. This means the peak of energy usage in the two regions will occur in two different time periods. This paper studies the feasibility of building a transmission line to connect the energy markets in both east and west Australia. A simplified market simulation model is developed to investigate the operation of the interconnected market. The market prices in different regions with and without the proposed interconnection will be calculated by the proposed simulation model.
| Original language | English |
|---|---|
| Title of host publication | IET Seminar Digest |
| Publisher | Institution of Engineering and Technology |
| Volume | 2015 |
| ISBN (Print) | 9781785610103, 9781785610523, 9781785610806, 9781785610820, 9781785610943, 9781785611063, 9781785611094, 9781785611148, 9781785611155, 9781785611162, 9781785611179, 9781785611186, 9781785611285, 9781785611315, 9781785611582, 9781785611902, 9781785612190, 9781785612237, 9781849199827, 9781849199841 |
| DOIs | |
| Publication status | Published - 2015 |
| Externally published | Yes |
| Event | 10th International Conference on Advances in Power System Control, Operation and Management, APSCOM 2015 - Hong Kong, China Duration: 8 Nov 2015 → 12 Nov 2015 http://digitallibrary.theiet.org/content/conferences/2015/0008 |
Conference
| Conference | 10th International Conference on Advances in Power System Control, Operation and Management, APSCOM 2015 |
|---|---|
| Place | China |
| City | Hong Kong |
| Period | 8/11/15 → 12/11/15 |
| Internet address |
Bibliographical note
Publication details (e.g. title, author(s), publication statuses and dates) are captured on an “AS IS” and “AS AVAILABLE” basis at the time of record harvesting from the data source. Suggestions for further amendments or supplementary information can be sent to [email protected].Research Keywords
- Economic benefits
- Interconnection
- Market simulation
- System reliability
Fingerprint
Dive into the research topics of 'Assessing the feasibility of the interconnected power market in Australia'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver