Skip to main navigation Skip to search Skip to main content

Application of GA techniques for solving precedent relationship problem in project scheduling optimization

    Research output: Journal Publications and Reviews › RGC 21 - Publication in refereed journal › peer-review

    24 Downloads (CityUHK Scholars)

    Abstract

    Based on Genetic Algorithms (GAs) with matrix approach, the presented method introduces a pre-decision variable to suit the precedent relationship of activities in project scheduling problem and this could avoid the modification of traditional genetic algorithm operators and chromosome structures which will trigger great time consuming for searching solutions. Two types of scheduling problem in construction industry are considered in this paper, traditional contracts with fixed finish time constraint and the Build-Operate-Transfer (BOT) which has a flexible deadline with a reward/penalty regulation. Details of the problem formulation and encoding method are shown and six trial tests are performed with good evolution results.
    Original languageEnglish
    Pages (from-to)2527-2534
    JournalProcedia Engineering
    Volume14
    DOIs
    Publication statusPublished - 2011
    Event12th East Asia-Pacific Conference on Structural Engineering and Construction (EASEC-12) - Hong Kong Convention & Exhibition Centre, Hong Kong, China
    Duration: 26 Jan 2011 → 28 Jan 2011
    http://bccw.cityu.edu.hk/easec12/wp_home.asp

    Research Keywords

    • Genetic Algorithms
    • Project scheduling
    • Time and Cost Optimization

    Publisher's Copyright Statement

    • This full text is made available under CC-BY-NC-ND 3.0. https://creativecommons.org/licenses/by-nc-nd/3.0/

    Fingerprint

    Dive into the research topics of 'Application of GA techniques for solving precedent relationship problem in project scheduling optimization'. Together they form a unique fingerprint.

    Cite this