Skip to main navigation Skip to search Skip to main content

A schedule-based timetable model for congested transit networks

  • Jiemin Xie
  • , Shuguang Zhan
  • , S.C. Wong*
  • , S.M. Lo
  • *Corresponding author for this work

Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

Abstract

This study proposes a model and method for solving the transit timetabling problem with consideration of passenger path choices within a congested and schedule-based transit network. The model has two submodels: transit timetabling and passenger-equilibrium assignment. The transit timetabling submodel generates timetables to improve passengers’ journey experience based on the results of passenger-equilibrium assignment, whereas the passenger-equilibrium assignment loads passengers on transit vehicles based on a fixed vehicle capacity and timetable output from the transit timetabling. An iterative method is developed to connect these two submodels and efficiently determine an optimal solution. The iterative method includes an equilibrium assignment method to simulate passenger loading and suggests a decomposition approach for transit timetabling. The decomposition approach has a significant computational advantage when handling transit systems that involve hundreds of transit vehicles because the algorithm generates a timetable for one transit line in each step rather than for all transit lines. The decomposition approach can therefore handle relatively large problems with more transit lines. The suggested algorithms are analyzed with a hypothetical example and with the practically sized example of South China's high-speed railway in terms of efficiency, optimality, and applicability.
Original languageEnglish
Article number102925
JournalTransportation Research Part C: Emerging Technologies
Volume124
Online published28 Dec 2020
DOIs
Publication statusPublished - Mar 2021

Research Keywords

  • Decomposition approach
  • Schedule-based
  • Timetabling
  • Transit network

Fingerprint

Dive into the research topics of 'A schedule-based timetable model for congested transit networks'. Together they form a unique fingerprint.
  • TBRS: Safety, Reliability, and Disruption Management of High Speed Rail and Metro Systems

    XIE, M. (Principal Investigator / Project Coordinator), BENSOUSSAN, A. (Co-Principal Investigator), LO, S. M. (Co-Principal Investigator), SHOU, B. (Co-Principal Investigator), SINGPURWALLA, N. D. (Co-Principal Investigator), TSE, W. T. P. (Co-Principal Investigator), TSUI, K. L. (Co-Principal Investigator), YU, Y. (Co-Principal Investigator), YUEN, K. K. R. (Co-Principal Investigator), CHAN, A. B. (Co-Investigator), CHAN, N.-H. (Co-Investigator), CHIN, K. S. (Co-Investigator), CHOW, H. A. (Co-Investigator), Chow, W. K. (Co-Investigator), EDESESS, M. (Co-Investigator), GOLDSMAN, D. M. (Co-Investigator), Huang, J. (Co-Investigator), LEE, W. M. (Co-Investigator), LI, L. (Co-Investigator), LI, C. L. (Co-Investigator), LING, M. H. A. (Co-Investigator), LIU, S. (Co-Investigator), MURAKAMI, J. (Co-Investigator), NG, S. Y. S. (Co-Investigator), NI, M. C. (Co-Investigator), TAN, M.H.-Y. (Co-Investigator), Wang, W. (Co-Investigator), Wang, J. (Co-Investigator), WONG, C. K. (Co-Investigator), WONG, S. Y. Z. (Co-Investigator), WONG, S. C. (Co-Investigator), Xu, Z. (Co-Investigator), ZHANG, Z. (Co-Investigator), Zhang, D. (Co-Investigator), ZHAO, J. L. (Co-Investigator) & Zhou, Q. (Co-Investigator)

    1/01/1631/12/21

    Project: Research

Cite this