Abstract
In this paper, we consider optimal production and setup scheduling in a failure-prone manufacturing system consisting of a single machine. The system can produce several types of products, but at any given time it can only produce one type of product. A setup is required if production is to be switched from one type of product to another. The decision variables are a sequence of setups and a production plan. The objective of the problem is to minimize the costs of setup, production, and surplus. An approximate optimality condition is given together with a computational algorithm for solving the optimal control problem.
| Original language | English |
|---|---|
| Pages (from-to) | 1452-1455 |
| Journal | IEEE Transactions on Automatic Control |
| Volume | 42 |
| Issue number | 10 |
| DOIs | |
| Publication status | Published - 1997 |
| Externally published | Yes |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Research Keywords
- HJB equation
- Machine setup
- Numerical method
- Production planning
- Scheduling
Fingerprint
Dive into the research topics of 'A numerical method in optimal production and setup scheduling of stochastic manufacturing systems'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver