Skip to main navigation Skip to search Skip to main content

A new LP rounding algorithm for the active time problem

  • Gruia Cǎlinescu
  • , Kai Wang*
  • *Corresponding author for this work

Research output: Journal Publications and ReviewsRGC 21 - Publication in refereed journalpeer-review

Abstract

In this paper, we work on the scheduling problem with active time model. We have a set of preemptive jobs with integral release times, deadlines and required processing lengths, while the preemption of jobs is only allowed at integral time points. We have a single machine that can process at most g distinct job units at any given time unit when the machine is switched on. The objective is to find a schedule that completes all jobs within their timing constraints and minimizes the time when the machine is on, i.e., the active time. This problem has been studied by Chang et al. where they proposed an LP rounding approach which gives a 2-approximation solution. In this paper, we also give a 2-approximation algorithm based on LP rounding approach with a different rounding technique and analysis. Finally, we give a new linear programming formulation for which we conjecture that the integrality gap is 5/3, which might bring new hope for beating the barrier of 2 for the approximation ratio.
Original languageEnglish
Pages (from-to)543-552
JournalJournal of Scheduling
Volume24
Issue number5
Online published6 Mar 2021
DOIs
Publication statusPublished - Oct 2021

Research Keywords

  • Active time
  • Approximation algorithm
  • Linear program rounding
  • Scheduling

Fingerprint

Dive into the research topics of 'A new LP rounding algorithm for the active time problem'. Together they form a unique fingerprint.

Cite this