A control chart for the Gamma distribution as a model of time between events
Research output: Journal Publications and Reviews › RGC 21 - Publication in refereed journal › peer-review
Author(s)
Detail(s)
Original language | English |
---|---|
Pages (from-to) | 5649-5666 |
Journal / Publication | International Journal of Production Research |
Volume | 45 |
Issue number | 23 |
Publication status | Published - Dec 2007 |
Externally published | Yes |
Link(s)
Abstract
In this paper, control charts for monitoring exponentially distributed time between events (TBE) are studied. In particular, a Gamma chart which monitors the time until the rth event is proposed and investigated. A new method based on a random-shift model for calculating the out-of-control average time to signal (ATS) of the Gamma chart is developed. It is shown to be much more accurate than the conventional method based on a fixed-shift model through comparing with Monte Carlo simulation. A comparison is also made among the exponential, the Gamma and the exponential CUSUM charts, which shows that the Gamma chart is more sensitive than the exponential chart and the performance of a Gamma chart with r = 4 is comparable with that of an exponential CUSUM optimally designed. However, the advantage of the Gamma chart is the ease involved in the design, evaluation and implementation. The use of the Gamma chart is illustrated with two real and one simulated examples.
Research Area(s)
- Control chart, Exponential distribution, Gamma distribution, Random-shift model, Time between events
Citation Format(s)
A control chart for the Gamma distribution as a model of time between events. / Zhang, C. W.; Xie, M.; Liu, J. Y. et al.
In: International Journal of Production Research, Vol. 45, No. 23, 12.2007, p. 5649-5666.
In: International Journal of Production Research, Vol. 45, No. 23, 12.2007, p. 5649-5666.
Research output: Journal Publications and Reviews › RGC 21 - Publication in refereed journal › peer-review