Abstract
Demand side management, reserve capacity on demand side and reserve capacity on generation side have been studied separately till now. For generation capacity adequacy (GCA) control purpose, implementing time-of-use power price can be regarded as preventive control and reserve capacity on generation side, interruptible load with low price, interruptible load with high reparations can be considered as emergency/corrective controls. In order to improve GCA economically, their different properties on technique aspect as well as those on economic aspect make the coordination of the various kinds of control actions possible. Coordinative models and optimization algorithm are proposed from the viewpoints of risk management. Effects of various control schemes are studied quantitatively and simulation results are reported as well.
| Translated title of the contribution | Hybrid optimization of generation capacity adequacy |
|---|---|
| Original language | Chinese (Simplified) |
| Pages (from-to) | 30-35 |
| Journal | 电力系统自动化 |
| Volume | 31 |
| Issue number | 12 |
| Online published | 14 Jun 2007 |
| Publication status | Published - 25 Jun 2007 |
| Externally published | Yes |
Research Keywords
- 发电容量充裕性
- 可中断负荷
- 备用发电容量
- 多市场协调优化
- Generation capacity adequacy
- Interruptible load
- Reserve generation capacity
- Multi-market coordination optimization
Fingerprint
Dive into the research topics of 'Hybrid optimization of generation capacity adequacy'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver