Motivated by a real-world application, the proposed project will consider a supply chain
with one distribution center (DC) and multiple retailers which face exogenous stochastic
demands. The retailers replenish their stock from the DC, which in turn replenishes
from an external source. The supply chain is operated under installation-stock based (or
semi-decentralized) control. Linear purchasing costs will be considered, but the DC must
order either none or at least as much as a minimum order quantity (MOQ). The objective
is to minimize the costs for ordering, for capital tied up in the supply chain, and for not
providing an adequate customer service.In the actual application, the distribution requirement planning framework (DRP) was
suggested for the system inventory control. DRP is a time-phased replenishment
approach in which orders are generated periodically, based on demand forecasts over the
leadtime, inventory and outstanding order status. The concepts and logic used are
similar to those of material requirements planning (MRP), yet their connections with
multi-echelon inventory models are different. Safety stocks are used to cope with
uncertainties. The safety stock at each location is determined according to the
forecasting errors over the (average) leadtime and certain service level requirement.
Clearly, this logic is based on the simple-location setting, the solution of which is hence
far from optimal. Only a few studies have provided results that can be used to determine
the safety stocks in the DRP framework. However, they do not consider the MOQ. The
primary purpose of the proposed study is to develop implementable procedures that on
one hand, incorporate the MOQ, and on the other, can help improve the performance of
DRP. The contribution lies in the effort towards bridging the gap between multi-echelon
inventory theory and the DRP practice.