The problem of power harmonics now becomes the No. 1 headache in commercial
buildings in Hong Kong, particularly more serious in those high-rise commercial
buildings. International as well as local requirements have been adopted to set limits on
the power harmonics level, beyond which harmonics mitigation measures are to be
implemented. The applicants carried out consultancy projects in the past to find out the
causes of accidental explosion of power factor correction capacitor banks and combustion
of overloaded cables while all pointed to the same cause, harmonics pollution. The
present solutions to power harmonics problems are mainly installation of power quality
monitoring devices in standalone manner or networked for continuous power quality
monitoring, and the use of passive or active harmonic filters. As the power harmonic
profiles of a commercial building is dynamically changing due to load variations,
occupational changes and changes in system configurations, any harmonics filtering
scheme has to be modified from time to time. A networked power quality monitoring
system is therefore deemed necessary which can be integrated with the building
management system for continuous monitoring. By the way, it is also the top
responsibility of a facility manager to find out the tenant who pollutes the power
distribution system with harmonics, which is not a piece of easy job.The questions in practice are how to optimize the configuration of a networked power
quality monitoring system so as to select and install power harmonics filters of optimal
sizes and at optimal locations, and to find out the chief offender, i.e. the source of
pollutants. That requires knowledge of the origin and distribution of harmonics, and the
decomposition of a combined harmonics spectrum into individual patterns caused by
individual non-linear loads. With all such information in mind, it is possible to draw a
full harmonics distribution map of the whole power network with details down to every
point of common coupling. As a beginning, the scope of the project will be confined to a
typical office environment.
| Project number | 9041380 |
|---|---|
| Grant type | GRF |
| Status | Finished |
| Effective start/end date | 1/01/09 → 12/09/11 |