Dr. LEUNG Wing Tak Arthur (梁永達)

Research Output

  1. 2021
  2. Online published

    A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques

    Sing, M. C. P., Edwards, D. J., Leung, A. W. T., Liu, H. & Roberts, C. J., 25 Aug 2021, (Online published) In: Engineering, Construction and Architectural Management.

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Check@CityULib
  3. 2015
  4. Published

    Relationship Between Top Executives’ Characteristics and Corporate Environmental Responsibility: Evidence from China

    Meng, X. H., Zeng, S. X., Leung, A. W. T. & Tam, C. M., 2015, In: Human and Ecological Risk Assessment. 21, 2, p. 466-491

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 10
    Check@CityULib
  5. 2010
  6. Published

    Assessment of Impacts of Project Technical Complexity on Building Production Using Clustering and Knowledge-based System

    LEUNG, A. W. T. & TAM, C. M., 16 Nov 2010, Proceedings of CIB W78 2010: 27th International Conference - Applications of IT in the AEC Industry & Accelerating BIM Research Workshop.

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)peer-review

    Check@CityULib
  7. Published

    Using Construction Process Simulation to Assess Productivity of Laying Water Mains in Hong Kong

    TAM, C. M. & LEUNG, A. W. T., 16 Nov 2010, Proceedings of CIB W78 2010: 27th International Conference - Applications of IT in the AEC Industry & Accelerating BIM Research Workshop.

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)peer-review

    Check@CityULib
  8. Published

    Assessing the impacts of spatial profile on site production using clustering techniques

    Leung, A. W. T. & Tam, C. M., Jun 2010, Proceedings of the International Conference on Computing in Civil and Building Engineering . Tizani, W. (ed.). Nottingham University Press

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)peer-review

    Check@CityULib
  9. 2008
  10. Published

    Assessing project staffing requirements using unsupervised clustering techniques

    Leung, A. W. T. & Tam, C. M., 2008, Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction. p. 613-622

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)peer-review

    Scopus citations: 1
    Check@CityULib
  11. Published

    FACTOR ANALYSIS MODEL FOR DEFINING PROJECT NATURES OF MODERN MULTI-FUNCTION BUILDING DEVELOPMENTS

    Leung, A. W. & Tam, C. M., 2008, In: International Journal for Housing Science and Its Applications. 32, 1, p. 29-39

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Check@CityULib
  12. 2006
  13. Published

    Comparative study on the complexity and scale of building projects

    Leung, A. W. T. & Tam, C. M., 2006, Construction and Professional Practices - Proceedings of the 10th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC 2010. Vol. 5. p. 257-262

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)peer-review

    Check@CityULib
  14. Published

    Highlighting effective site safety measures by rough set approach

    Tam, C. M., Chan, K. K. & Leung, A. W. T., 2006, Construction and Professional Practices - Proceedings of the 10th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC 2010. Vol. 5. p. 263-268

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)peer-review

    Check@CityULib
  15. 2002
  16. Published

    Site layout planning using nonstructural fuzzy decision support system

    Tam, C. M., Tong, T. K. L., Leung, A. W. T. & Chiu, G. W. C., May 2002, In: Journal of Construction Engineering and Management. 128, 3, p. 220-231

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 67
    Check@CityULib
  17. Published

    Nonlinear models for predicting hoisting times of tower cranes

    Tam, C. M., Leung, A. W. T. & Liu, D. K., Jan 2002, In: Journal of Computing in Civil Engineering. 16, 1, p. 76-81

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 30
    Check@CityULib
  18. 2001
  19. Published

    Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes

    Leung, A. W. T., Tam, C. M. & Liu, D. K., May 2001, In: Building and Environment. 36, 4, p. 457-467

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 42
    Check@CityULib
  20. 1999
  21. Published

    Models for assessing hoisting times of tower cranes

    Leung, A. W. T. & Tam, C. M., Dec 1999, In: Journal of Construction Engineering and Management. 125, 6, p. 385-391

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 21
    Check@CityULib
  22. Published

    Prediction of hoisting time for tower cranes for public housing construction in Hong Kong

    Leung, A. W. T. & Tam, C. M., 1999, In: Construction Management and Economics. 17, 3, p. 305-314

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 21
    Check@CityULib