Dr. KIM Jung In

Research Output

  1. 2019
  2. The impact of leed-energy star certified office buildings on the market value of adjoining buildings in New York city

    Suh, M. J., Pearce, A. R., Song, Y., Kwak, Y. H., Kim, J. I. & Zhang, Y., 1 Dec 2019, In : Journal of Green Building. 14, 1, p. 31-52 22 p.

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Check@CityULib
  3. Published

    Exploring the Factor-Performance Relationship of Integrated Project Delivery Projects: A Qualitative Comparative Analysis

    Yu, J. H., Yoo, S. E., Kim, J. I. & Kim, T. W., 1 Jun 2019, In : Project Management Journal. 50, 3, p. 335-345

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Check@CityULib
  4. Published

    Evaluation of Reshuffling Efforts to Comply with Installation Sequences of Prefabricated Interior Wall Panels from Bunks Delivered On Site

    Lee, Y., Fischer, M. & Kim, J. I., Jun 2019, Computing in Civil Engineering 2019: Visualization, Information Modeling, and Simulation - Selected Papers from the ASCE International Conference on Computing in Civil Engineering. Cho, Y. K., Leite, F., Behzadan, A. & Wang, C. (eds.). American Society of Civil Engineers (ASCE), p. 635-642 (Computing in Civil Engineering).

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)Not applicablepeer-review

    Check@CityULib
  5. Efficient Customer Selection Process for Various DR Objectives

    Kwac, J., Kim, J. I. & Rajagopal, R., Mar 2019, In : IEEE Transactions on Smart Grid. 10, 2, p. 1501-1508

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Check@CityULib
  6. 2018
  7. Published

    Formal representation of cost and duration estimates for hard rock tunnel excavation

    Kim, J. I., Fischer, M. & Suh, M. J., Dec 2018, In : Automation in Construction. 96, p. 337-349

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Check@CityULib
  8. Published

    Generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction

    Kim, J. I., Fischer, M. & Kam, C., Dec 2018, In : Automation in Construction. 96, p. 378-397

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Check@CityULib
  9. Construction Parts in Building Projects: Definition and Case Study

    Zhao, N., Kam, C., Lo, J. T. Y., Kim, J. I. & Fischer, M., Jul 2018, In : Journal of Management in Engineering. 34, 4, 04018014.

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Scopus citations: 1
    Check@CityULib
  10. Mathematical Analysis for Roundabout Capacity

    Suh, W., Kim, J. I., Kim, H., Ko, J. & Lee, Y., 2018, In : Mathematical Problems in Engineering. 2018, 4310894.

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Check@CityULib
  11. 2017
  12. Vision-based surveillance system for monitoring traffic conditions

    Park, M., In Kim, J., Lee, Y., Park, J. & Suh, W., Dec 2017, In : Multimedia Tools and Applications. 76, 23, p. 25343-25367

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Scopus citations: 3
    Check@CityULib
  13. Risk analysis model for regional railroad investment

    Suh, S., Suh, W. & Kim, J. I., 2017, In : Engineering Computations (Swansea, Wales). 34, 1, p. 164-173

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Scopus citations: 1
    Check@CityULib
  14. 2016
  15. Integration of BIM and GIS for formal representation of walkability for safe routes to school programs

    Kim, J. I., Koo, B., Suh, S. & Suh, W., Jul 2016, In : KSCE Journal of Civil Engineering. 20, 5, p. 1669-1675

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Scopus citations: 7
    Check@CityULib
  16. 2015
  17. Evaluating risks using simulated annealing and Building Information Modeling

    Ryu, D., Kim, J. I., Suh, S. & Suh, W., 1 Oct 2015, In : Applied Mathematical Modelling. 39, 19, p. 5925-5935

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Scopus citations: 7
    Check@CityULib
  18. BIM-based decision-support method for master planning of sustainable large-scale developments

    Kim, J. I., Kim, J., Fischer, M. & Orr, R., Oct 2015, In : Automation in Construction. 58, p. 95-108 1928.

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Scopus citations: 20
    Check@CityULib
  19. Forecasting hourly traffic volume: Incheon international airport access road

    Kim, S., Suh, W. & Kim, J., Aug 2015, In : Scientia Iranica. 22, 4, p. 1510-1516

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Check@CityULib
  20. Feasibility study on an evidence-based decision-support system for hospital site selection for an aging population

    Kim, J. I., Senaratna, D. M., Ruza, J., Kam, C. & Ng, S., Mar 2015, In : Sustainability (Switzerland). 7, 3, p. 2730-2744

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Scopus citations: 5
    Check@CityULib
  21. Sustainable, age-friendly cities: An evaluation framework and case study application on Palo Alto, California

    Ruza, J., Kim, J. I., Leung, I., Kam, C. & Ng, S. Y. M., Feb 2015, In : Sustainable Cities and Society. 14, p. 390-396

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Scopus citations: 11
    Check@CityULib
  22. 2014
  23. Simulation Time Experiments in Distributed Traffic Simulation Environments

    Kim, J., Kim, S. & Suh, W., May 2014, ICISA 2014 - 2014 Fifth International Conference on Information Science and Applications. IEEE, 6847464. (ICISA - International Conference on Information Science and Applications).

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)Not applicablepeer-review

    Check@CityULib
  24. Traffic Simulation Software: Traffic flow characteristics in CORSIM

    Kim, S., Suh, W. & Kim, J., May 2014, ICISA 2014 - 2014 Fifth International Conference on Information Science and Applications. IEEE, 6847475. (ICISA - International Conference on Information Science and Applications).

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)Not applicablepeer-review

    Check@CityULib
  25. 2013
  26. Requirements to Enhance the Decision-Making Process for Tunnel Construction by Virtual Design and Construction (VDC)

    Kim, J. I. & Fischer, M., Jun 2013, COMPUTING IN CIVIL ENGINEERING: PROCEEDINGS OF THE 2013 ASCE INTERNATIONAL WORKSHOP ON COMPUTING IN CIVIL ENGINEERING. Brilakis, I., Lee, S. & Becerik-Gerber, B. (eds.). p. 323-330 (Computing in Civil Engineering - Proceedings of the ASCE International Workshop on Computing in Civil Engineering).

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)Not applicablepeer-review

    Check@CityULib
  27. An Empirical Study of MEP Workspace Modeling Approaches for 4D Model-based Time-Space Conflict Analyses: Case Study on the International Linear Collider Project

    Koo, B., Kim, J. & Kim, J., May 2013, In : KSCE Journal of Civil Engineering. 17, 4, p. 627-637

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalNot applicablepeer-review

    Scopus citations: 3
    Check@CityULib
Previous 1 2 Next