Prof. YAN Houmin (嚴厚民)

Research Output

  1. 1999
  2. Optimal production planning in pull flow lines with multiple products

    Yang, J., Yan, H. & Sethi, S. P., 16 Dec 1999, In: European Journal of Operational Research. 119, 3, p. 582-604

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 7
    Check@CityULib
  3. Approximating an optimal production policy in a continuous flow line: Recurrence and asymptotic properties

    Yan, H., Zhou, X. Y. & Yin, G., Jul 1999, In: Operations Research. 47, 4, p. 535-549

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 10
    Check@CityULib
  4. Efficient setup/dispatching policies in a semiconductor manufacturing facility

    Sethi, S. P., Sriskandarajah, C., Chu, K. F. & Yan, H., 1999, In: Proceedings of the IEEE Conference on Decision and Control. 2, p. 1368-1373

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)22_Publication in policy or professional journal

    Scopus citations: 7
    Check@CityULib
  5. Scheduling to minimize product design time using a genetic algorithm

    Lam, F. S. C., Lin, B. C., Sriskandarajah, C. & Yan, H., 1999, In: International Journal of Production Research. 37, 6, p. 1369-1386

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 19
    Check@CityULib
  6. Stochastic optimization algorithms for marketing-production manufacturing systems

    Yin, G., Yan, H., Zhang, Q. & Boukas, E. K., 1999, In: Proceedings of the IEEE Conference on Decision and Control. 1, p. 925-930

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)22_Publication in policy or professional journal

    Check@CityULib
  7. 1998
  8. Production scheduling of continuous flow lines: Multiple products with setup times and costs

    Cheng, F., Yan, H. & Yang, J., Dec 1998, In: Production and Operations Management. 7, 4, p. 387-400

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 9
    Check@CityULib
  9. Optimal Production Planning in a Multi-Product Stochastic Manufacturing System with Long-Run Average Cost

    Sethi, S. P., Suo, W., Taksar, M. I. & Yan, H., 1998, In: Discrete Event Dynamic Systems: Theory and Applications. 8, 1, p. 37-54

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 26
    Check@CityULib
  10. 1997
  11. A numerical method in optimal production and setup scheduling of stochastic manufacturing systems

    Yan, H. & Zhang, Q., 1997, In: IEEE Transactions on Automatic Control. 42, 10, p. 1452-1455

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 67
    Check@CityULib
  12. 1996
  13. Minimum average-cost production plan in a multi-product stochastic manufacturing system

    Sethi, S. P., Suo, W., Taksar, M. I. & Yan, H., 1996, IEEE Symposium on Emerging Technologies & Factory Automation, ETFA. IEEE, Vol. 1. p. 361-365

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)peer-review

    Scopus citations: 1
    Check@CityULib
  14. Optimal production control in pull flow lines with multiple part types: A summary

    Yang, J., Yan, H. & Sethi, S. P., 1996, In: Proceedings of the IEEE Conference on Decision and Control. 4, p. 3847-3848

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)62_Review of books or of software (or similar publications/items)peer-review

    Scopus citations: 1
    Check@CityULib
  15. Testing the robustness of two-boundary control policies in semiconductor manufacturing

    Yan, H., Lou, S., Sethi, S., Gardel, A. & Deosthali, P., 1996, In: IEEE Transactions on Semiconductor Manufacturing. 9, 2, p. 285-288

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 24
    Check@CityULib
  16. 1995
  17. Numerical method in optimal production and setup scheduling of stochastic manufacturing systems: summary of results

    Yan, H. & Zhang, Q., 1995, In: Proceedings of the IEEE Conference on Decision and Control. 3, p. 2872-2877

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)22_Publication in policy or professional journal

    Scopus citations: 4
    Check@CityULib
  18. The optimal number of kanbans in a manufacturing system with general machine breakdowns and stochastic demands

    Yan, H., 1995, In: International Journal of Operations and Production Management. 15, 9, p. 89-103

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 7
    Check@CityULib
  19. 1994
  20. Using stochastic optimization to determine threshold values for the control of unreliable manufacturing systems

    Yan, H., Yin, G. & Lou, S. X. C., Dec 1994, In: Journal of Optimization Theory and Applications. 83, 3, p. 511-539

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 37
    Check@CityULib
  21. Further results on approximation of the optimal threshold values for manufacturing systems

    Yin, G. & Yan, H. M., 1994, In: Proceedings of the IEEE Conference on Decision and Control. 2, p. 1588-1589

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)22_Publication in policy or professional journal

    Check@CityULib
  22. 1993
  23. Feedback production planning in a stochastic two-machine flowshop: Asymptotic analysis and computational results

    Sethi, S., Yan, H., Zhang, Q. & Zhou, X. Y., Jul 1993, In: International Journal of Production Economics. 30-31, C, p. 79-93

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journalpeer-review

    Scopus citations: 9
    Check@CityULib
  24. 1991
  25. Using simulation to test the robustness of various existing production control policies

    Lou, S., Yan, H., Sethi, S., Gardel, A. & Deosthali, P., Dec 1991, Winter Simulation Conference Proceedings. Publ by IEEE, p. 261-269

    Research output: Chapters, Conference Papers, Creative and Literary Works (RGC: 12, 32, 41, 45)32_Refereed conference paper (with ISBN/ISSN)peer-review

    Scopus citations: 2
    Check@CityULib
Previous 1 2 3 4 Next