Quality Engineering

Quality Engineering

ISSNs: 0898-2112

Additional searchable ISSN (Electronic): 1532-4222

TAYLOR & FRANCIS INC, United States

Scopus rating (2019): CiteScore 2.4 SJR 0.774 SNIP 1.155

Journal

Journal Metrics

Research Output

  1. 2020
  2. Online published

    Multivariate time-between-events monitoring: An overview and some overlooked underlying complexities

    Zwetsloot, I. M., Mahmood, T. & Woodall, W. H., 24 Jul 2020, In : Quality Engineering.

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Check@CityULib
  3. Online published

    A review of dispersion control charts for multivariate individual observations

    Ajadi, J. O., Wang, Z. & Zwetsloot, I. M., 5 Jun 2020, In : Quality Engineering. 17 p.

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Check@CityULib
  4. 2018
  5. Published

    Discussion of “Quality and statistical thinking in a parliament and beyond”

    Lameijer, B. A., Zwetsloot, I. M. & Does, R. J. M. M., 2 Jan 2018, In : Quality Engineering. 30, 1, p. 27-33

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)Comment/debate

    Check@CityULib
  6. Published

    A reliability assessment approach for systems with heterogeneous component information

    Xu, J., Yu, D., Hu, Q. & Xie, M., 2018, In : Quality Engineering. 30, 4, p. 676–686

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 3
    Check@CityULib
  7. Published

    Lean Six Sigma meets data science: Integrating two approaches based on three case studies

    Zwetsloot, I. M., Kuiper, A., Akkerhuis, T. S. & de Koning, H., 2018, In : Quality Engineering. 30, 3, p. 419-431

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 8
    Check@CityULib
  8. 2017
  9. A head-to-head comparative study of the conditional performance of control charts based on estimated parameters

    Zwetsloot, I. M. & Woodall, W. H., Apr 2017, In : Quality Engineering. 29, 2, p. 244-253

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 15
    Check@CityULib
  10. Published

    Discussion of “Analyzing Behavioral Big Data: Methodological, practical, ethical, and moral issues”

    Tsui, K. L. & Zhao, Y., 2 Jan 2017, In : Quality Engineering. 29, 1, p. 79-83

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)Comment/debate

    Check@CityULib
  11. Discussion of "Bridging the gap between theory and practice in basic statistical process monitoring"

    Goedhart, R., Schoonhoven, M., Zwetsloot, I. M. & Does, R. J. M. M., 2 Jan 2017, In : Quality Engineering. 29, 1, p. 18-21

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)Editorial Preface

    Check@CityULib
  12. 2016
  13. CUSUM charts with controlled conditional performance under estimated parameters

    Saleh, N. A., Zwetsloot, I. M., Mahmoud, M. A. & Woodall, W. H., Oct 2016, In : Quality Engineering. 28, 4, p. 402-415

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 26
    Check@CityULib
  14. 2015
  15. Quality Quandaries: Increasing the First Time Fix Rate in a Customer Contact Center

    Zwetsloot, I. M., Buitenhuis, M., Lameijer, B. A. & Does, R. J. M. M., 3 Jul 2015, In : Quality Engineering. 27, 3, p. 393-400

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 2
    Check@CityULib
  16. Quality Quandaries: Improving Revenue by Attracting More Clients Online

    Zwetsloot, I. M. & Does, R. J. M. M., 2 Jan 2015, In : Quality Engineering. 27, 1, p. 130-137

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 3
    Check@CityULib
  17. 2013
  18. Published

    Analyzing Highly Censored Reliability Data without Exact Failure Times: An Efficient Tool for Practitioners

    Zhang, C. W., Zhang, T., Xu, D. & Xie, M., 1 Oct 2013, In : Quality Engineering. 25, 4, p. 392 - 400

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 8
    Check@CityULib
  19. 2011
  20. Identifying feasible design concepts for products with competing performance requirements by metamodeling of loss-scaled principal components

    Murphy, T. E., Lin, Y., Tsui, K. L., Chen, V. C. P. & Allen, J. K., Apr 2011, In : Quality Engineering. 23, 2, p. 167-179

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 1
    Check@CityULib
  21. 2008
  22. A review of healthcare, public health, and syndromic surveillance

    Tsui, K., Chiu, W., Gierlich, P., Goldsman, D., Liu, X. & Maschek, T., 2008, In : Quality Engineering. 20, 4, p. 435-450

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)62_Review of books or of software (or similar publications/items)

    Scopus citations: 55
    Check@CityULib
  23. 2003
  24. Statistical control of a Six Sigma process

    Goh, T. N. & Xie, M., Jun 2003, In : Quality Engineering. 15, 4, p. 587-592

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 36
    Check@CityULib
  25. 2001
  26. Listening to the future voice of the customer using fuzzy trend analysis in QFD

    Shen, X. X., Xie, M. & Tan, K. C., Mar 2001, In : Quality Engineering. 13, 3, p. 419-425

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 58
    Check@CityULib
  27. 1997
  28. Interpretation of process capability indices and some alternatives

    Tsui, K., 1997, In : Quality Engineering. 9, 4, p. 587-596

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 33
    Check@CityULib
  29. 1993
  30. Counterexamples for the component search procedure

    Amster, S. & Tsui, K., 1 Jan 1993, In : Quality Engineering. 5, 4, p. 545-552

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 2
    Check@CityULib
  31. 1992
  32. Expressing variability and yield with a focus on the customer

    Ng, K. K. & Tsui, K., 1 Jan 1992, In : Quality Engineering. 5, 2, p. 255-267

    Research output: Journal Publications and Reviews (RGC: 21, 22, 62)21_Publication in refereed journal

    Scopus citations: 13
    Check@CityULib